Project: LNG Storage Tank Darwin
Client: Bechtel
Contractor: Thiess TTK
As engineering consultants to Thiess TKK, BG&E have undertaken the structural design of the concrete outer containment walls and base slab of this 188,00m3 LNG storage tank. The walls are designed to contain the LNG at a temperature of -168°C, in the event of a failure of the steel, inner tank.
Features:
- 92m diameter, 35m high containment tank that is post-tensioned both circumferentially and vertically.
- Fixed wall to base connection.
- Uniform wall thickness for majority of height.
- Four pilasters for post-tensioning of circumferential cables.
- Vertical cables without loops to avoid risk of blockages.
- Use of cryogenic steel reinforcement.
- Designed for severe thermal gradient effects.